September 10 Weekly Rainier Ave. S. Project Update
Road impacts
- Hayes Pl, SW Victoria St, and S. 2nd St intermittent nighttime closures for grinding and paving through Friday, September 12
Please note: Paving work is subject to weather conditions. Local access will be maintained during these temporary closures, and temporary barricades will be set up for safe passage.
Full schedule available here: Rainier Ave Schedule Update(PDF, 604KB) (updated 6/4/2024)
Night work
Nighttime work at the Airport Way intersection will continue through mid-September, taking place Monday evenings through Friday mornings. Drivers should follow posted signs and closures and use extra caution when traveling through the area at night.
Once this phase of work is complete, nighttime construction will pause before resuming in late September through mid-October for the final paving and asphalt overlay. The overlay adds a smooth top layer that evens out the surface, improves ride quality, and helps protect the roadway for years to come.
Project look-ahead schedule
-
August 11
- Night work begins
-
September
- Grading and paving of driveways
- Paving roadways
- Curb, gutter, and sidewalk work is almost complete; remaining repairs are scheduled to follow
- Final paving during night work September
-
October
- Final striping

Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends